Zabok Mayor Valentina Đurek held a press conference in front of the built Zabok Transfer Station. She reacted to a statement by the HDZ and HSU Councillors' Club regarding the proposal for the new Spatial Development Plan for the City of Zabok.

The statement raised concerns about the change of land use in Gubaševo and the potential management of hazardous and radioactive waste. The trigger was a post by the president of the Councillors' Club, Petra Vrančić, titled 'Incinerators and radioactive waste in Gubaševo'.

Đurek considers the post sensationalist and incomplete. She believes it unnecessarily disturbs citizens. She stated that it is extremely irresponsible to introduce such headlines into the public sphere without comprehensive information. According to her, messages with false and misleading content about the alleged construction of an incinerator and the disposal of radioactive waste in Gubaševo are being spread through various communication channels. Such posts have caused unnecessary concern among citizens in the neighbouring town of Oroslavje as well.

The mayor emphasised that they are standing in front of the already built Zabok transfer station. This facility is intended for the management of non-hazardous waste only. She stated that this is not a project for the construction of an incinerator, a hazardous waste landfill, or a radioactive waste storage facility. It is, she said, exclusively for non-hazardous municipal waste. She explained that waste from the Zagorje region is brought here by smaller trucks, where it is pressed and transferred into containers, and then transported to the Piškornica Regional Centre for Waste Management. She stressed that there is no incineration; it is a transfer station.

Cadastral parcel 2359/1, according to ownership list 1300, is registered to Trgovačko društvo Piškornica d.o.o. with a share of 1/1. The Zabok transfer station has been built on this site, forming an integral part of the system of the Piškornica Regional Centre for Waste Management of northwestern Croatia. The project was financed within the framework of the National Recovery and Resilience Plan, specifically the call 'Construction of transfer stations intended to establish a complete and sustainable waste management system'. A technical inspection was carried out on 26 February this year, and a usage permit was issued on 16 March. Đurek showed the ownership list and building permit to media representatives.

The post in question raises issues regarding an area of 0.67 hectares to which the proposal for the new Spatial Plan assigns the purpose of waste management, code GO. Đurek explained that the location and function of the transfer station in Zabok as a building of national significance within the RCGO Piškornica system were established in the valid Spatial Plan of Krapina-Zagorje County. The City of Zabok must adopt this purpose when drafting the new spatial plan and, in accordance with the new Regulation (NN 152/2023), is obliged to assign a new code (KN-1-1-1850) (GO). She added that the other disputed parcel K3 is the Gubaševo closed landfill for non-hazardous waste, and K2 is the future city recycling yard. She stressed that the general list of buildings mentioned in the provisions of the Spatial Plan is not the same as a specific project for the construction of such buildings at a certain location.

Đurek announced that she will analyse the posts in question with her legal team and initiate appropriate legal proceedings where a legal basis is established. She asked Petra Vrančić and other opposition councillors, Nevenka Gregurić, Zoran Bunčec, Marko Cujzek and Robert Lež, to familiarise themselves with the presented documentation and publicly correct any inaccurate information.